Due to the heavy rainfall during the rainy season, the access road to our school was severely damaged. Deep trenches and potholes had formed, and the road was no longer in an acceptable condition. Although there isn’t much traffic at the school, the driveway is still important, especially when larger machines need to access the school for future construction work.

That’s why we had the road repaired. First, it was filled with locally sourced gravel, then compacted with a grader. Finally, a drainage ditch was created to prevent future erosion. You can see the progress in the attached photos.